S.No. 37/1/1 Kharadi,Dist.Pune.
Overview

Name of work:- Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune. A scheme of Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune. is taken in hand . The land is 8 KM. away from Pune railway Station and well approachable to Pune Nagar Road and Hadapsar Bye-pass road. 15 M wide D.P. Road is passing through the layout and the road is constructed by PMC. All amenities such as School, Hospital, Shopping etc. are available near the site.

Salient Features

Name of Scheme : Construction of 360 T/s LIG

Location : S.No. 37/1/1 Kharadi,Dist.Pune.

Types of Schemes : Lower Income Group

Total No.of Tenements : 360 T/s

Area Per Tenement : 26.89 Sqm.

Amenities of be provided in the Tenements.

  • Parking+Four Storied(Total five buildings).
  • R.C.C. open foundation and R.C.C. framed structure.
  • External walls: 150mm thk. Thokla bricks.
  • Internal walls: 115mm thk. H.B.B.
  • External doors: Solid core flush doors.
  • Toilet doors: P.V.C. shutter with R.C.C. door frame.
  • Windows: M.S. steel windows for room and toilet.Aluminium sliding window in passage area.
  • Flooring:
    • For Rooms:Marble Mosaic tiles with ceramic skirting.
    • For Toilet:Polished Shahabad with colored gazed tiles dado and W.C. white gazed tiled with colored gazed tiles dado.
  • External plaster: Sand faced plaster(2 coats).
  • Internal plaster: 12mm Neeru plaster.
  • Ceiling plaster: 6mm Neeru plaster.
  • External paint: Cement paint.
  • Internal paint: Powder distemper.
  • Kitchen otta: Polished kadappa top.
  • W.C. pan: Orrisa type.
  • Electrification: Casing capping with copper wiring.
Current
Project Details

 

  • Name of Work: Constructing 360 T/s under LIG at S.No. 37/1/1 Kharadi Pune.
  • Building No C4:
    The occupancy certificate is received on 15-06-2011. The allotment is in progress.
  • Building No C3:
    The occupancy certificate is received on 30-09-2011. The allotment is in progress.
  • Building No B, C1 and C2:
    The occupancy certificate is received on 20-07-2012. The allotment is in progress.